Joe and his team have to monitor 250 million cubic feet of natural gas (250MMcf/d) on a daily basis to minimize GLE and ensure 100% delivery.
If an asset fails or a DirectMount System leaks, it must be replaced immediately without losing valuable time for disassembly and assembly. After all, with every leak, no matter how small, the system operator loses money and he does not find that funny.
Continue reading